Rank the whole estate by installable kWp before you pick the sites to visit.

Rooftop Solar Suitability rates every roof and car park canopy in your portfolio for usable area, orientation and obstruction from very-high-resolution imagery, and sends back kWp per site, not square metres.

GSD
≤0.3 m (VHR)
Cadence
Annual
Platform
VHR satellite / aerial
Spectral
RGB

The job today

Where the desk screen runs out

A tender lands with a long list of retail units or distribution sheds. Someone opens each building in the aerial view, traces the roof, takes off the rooftop units and rooflights, leaves a setback along the parapet and works the rest into kWp. It is careful work and there is one building at a time of it. By the time the bid window closes, the shortlist is the sites you already knew, and the car parks never got looked at.

The desk screen, step by step

  1. Tracing the roof

    Desk screen and walk-down
    You open each building in the aerial view and draw the roof planes by hand.
    With Rooftop Solar Suitability
    Roof planes and canopy footprints come back as polygons for every address on your list, in one pass.
  2. Taking off obstructions

    Desk screen and walk-down
    You mark rooftop units, rooflights and plant one by one and size the clear area around them.
    With Rooftop Solar Suitability
    Obstructions are cut out of each polygon and the setback is applied, so the usable roof area is already net.
  3. Orientation

    Desk screen and walk-down
    You read the azimuth off the outline and note which planes face south and which do not.
    With Rooftop Solar Suitability
    Each plane carries an orientation class and a shading flag from neighbouring plant or buildings.
  4. Turning area into kWp

    Desk screen and walk-down
    You apply your own density rule to the cleared area, site by site, in a spreadsheet.
    With Rooftop Solar Suitability
    Each site has an installable kWp figure, with the roof and canopy shares shown separately.
  5. Building the shortlist

    Desk screen and walk-down
    You pick the sites you know are good, then desk-screen the rest as time allows.
    With Rooftop Solar Suitability
    The whole portfolio comes ordered by installable kWp, so the shortlist starts at the top of a list that covers every site.
  6. The site visit and the design

    Desk screen and walk-down
    Sites that pass the desk screen get a visit, a structural survey and a string layout.
    With Rooftop Solar Suitability
    The same visit, aimed at sites that earned it.
    Still yours
    The site visit, the roof condition and loading survey, the string layout and the PPA terms.

What you get

What comes back for the portfolio

  1. Spreadsheet

    Per-site kWp table

    One row per site: installable kWp, usable roof area, canopy area and orientation class. Opens in a spreadsheet and goes straight into the shortlist you already keep.

    Serves the turning-area-into-kWp row.

  2. GIS layer

    Roof and canopy polygons

    The outlines of each roof plane and canopy, with obstructions cut out and the setback applied. Opens in your GIS, so your design engineer can start from them.

    Serves the tracing and obstruction rows.

  3. Ranked table

    Ranked portfolio shortlist

    The sites in order of installable kWp, with the flags that explain why a site sits where it does.

    Serves the shortlist row.

How it works

Pilot timeline against your bid cycle

Pick a slice of the estate that matches an upcoming round of PPA bids. Run the pilot on that slice, compare it with the desk screen you have or would have done, then widen it to the rest of the portfolio.

  1. Portfolio in

    An address list or a boundary file for the sites in the pilot.

  2. Imagery pass

    We pull the latest clear VHR pass for each site, satellite or aerial.

  3. Roofs and canopies scored

    Planes and canopies are outlined, obstructions and setbacks taken out, orientation classed and area sized to kWp.

  4. Table and polygons out

    You get the ranked kWp table and the polygons, ready for the shortlist.

  5. Yearly re-rank

    One new pass a year updates the ranking where roofs have changed.

Limits

  • What the old method still does better

    A person at a desk with the building in front of them can see a plant room or a roof light that sits under a plane we read as clear. A site visit sees the roof surface, its condition and what it is made of.

  • Not a design

    Installable kWp is a siting estimate. It is not a string layout, a yield figure or a structural check.

  • Roof condition and loading

    Membrane wear, structural load and the age of the roof cannot be seen from above and are not rated. That survey comes after the shortlist.

  • Resolution floor

    At 0.3 m a pixel is about a foot across. Rooftop units, rooflights and canopy edges are large enough to see. Small vents and pipework do not, and are not traced.

  • Clouds and the yearly pass

    Optical imagery needs a clear pass. A site under cloud can wait for the next window. The rating is a snapshot of the last pass, not a live feed.

  • Roofs and canopies only

    Ground-mount, floating and agricultural sites are a different job and not covered here.

Who it's for

Switch if

  • You are an origination or development team ranking a retail or logistics estate before PPA bids
  • Your desk screen is the bottleneck between the tender and the shortlist
  • You are a property owner deciding which of your buildings to offer to a developer first

Stick with the desk screen if

  • You have a handful of sites and know them all
  • You need a design-grade layout or yield for a single building
  • You are rating the roof's condition or loading rather than its area

FAQ

Questions before a pilot

Does this replace the desk screen?

For the first pass over a portfolio, yes. The site visit, the structural survey and the design still happen, on the sites that make the shortlist.

How do we check it against our own numbers?

Send a few sites you have already traced, without your figures, and compare our outlines and kWp with yours.

Is installable kWp a design?

No. It is an estimate of what the usable area could take, for ranking. The string layout is yours.

What happens if a site is under cloud?

Optical imagery needs a clear pass. The site waits for the next one, and the rest of the table is not held up.

Does it cover car parks as well as roofs?

Yes. Parking canopies and covered bays are outlined and sized alongside the roofs.

How current is the rating?

As current as the last pass over that site. Roofs that have changed since the last pass are picked up at the next one.

Will it open in our systems?

It comes as a spreadsheet and as a GIS layer. We don't write into your CRM or design tool.

Who owns the imagery and the results?

Ownership and licence terms are agreed in writing when you start the pilot. If your legal team needs them earlier, ask.

How is it bought and priced?

It depends on how many sites and which imagery is used. Tell us the size of the portfolio and we will scope the pilot to it.

Get your portfolio ranked.

Send us a slice of the estate and we will show you what a pass returns.

Start a pilot