16 Nov 2026
Field notes: this quarter's portfolios, and why only one earned a walk-downA field-notes look at why two of three regional portfolios were cut at the desk screen this quarter, and what made the third worth a walk-down.
16 Nov 2026
What ground sample distance do you need to rank a portfolio without a walk-down?What ground sample distance a rooftop solar portfolio screen needs to replace a manual walk-down, and why coarser satellite imagery falls short.
9 Nov 2026
Satellite imagery vs LiDAR for rooftop solar shading analysisHow VHR satellite shading screens and LiDAR shading models each fit into ranking a C&I solar portfolio before PPA bids.
9 Nov 2026
What is a desktop shortlist in commercial solar portfolio screening?A desktop shortlist ranks a solar portfolio from a desk, before a single site visit. Here's what it covers and where it stops.
2 Nov 2026
Field notes: the portfolio that lost forty kilowatts to a tenant's new rooftop unitA warehouse portfolio's PPA numbers were stale before the ink dried. One new tenant HVAC unit cost forty kilowatts nobody caught until the walk-down.
2 Nov 2026
Roof life vs. panel warranty: setting a site cutoff for portfolio screeningHow to set a roof age cutoff when a 25-year panel warranty outlives the membrane. A screening rule for C&I solar portfolios before site visits.
26 Oct 2026
How to flag ponding water risk when scoring a roof for solar, before a site visitA desk-review method for spotting ponding risk on low-slope roofs from aerial imagery, before a crew gets sent to a portfolio.
26 Oct 2026
What is a single-line diagram, and why it matters before you fileWhat a single-line diagram shows, why C&I interconnection applications require it, and how roof screening affects the system size it's drawn around.
19 Oct 2026
Field notes: the roof that ranked last on paper and first after the re-roofA distribution center roof fell to the bottom of the shortlist on year one, then topped it on year two. What changed wasn't the roof's size.
19 Oct 2026
How fire code setback pathways shrink usable roof area for commercial solarFire code pathway and setback rules cut usable roof area more than most desk screens account for. Here's where the square footage goes.
14 Oct 2026
How to rank a multi-site portfolio before a PPA bidA working method for ranking roofs and canopies across a portfolio by installable kWp before you commit to a PPA bid list.
14 Oct 2026
Specific yield: why kWh per kWp beats raw kWp when ranking C&I roofsSpecific yield (kWh per kWp) explained, and why it beats raw kWp or square metres for ranking C&I solar roofs before a PPA bid.
13 Oct 2026
Ballasted vs mechanically attached racking on low-slope roofsHow ballasted and mechanically attached racking differ on membrane roofs, and why the choice changes how much kWp a low-slope roof can actually hold.
13 Oct 2026
How to screen out HVAC units and skylights when scoring a roof for solarWhy raw roof square footage overstates array capacity, and how to net out HVAC units, skylights and setbacks before you rank sites for PPA bids.
8 Oct 2026
How to calculate installable kWp from usable roof areaA walk-through of the math behind roof area to kWp conversion, and why raw square footage overstates what a commercial roof can hold.
8 Oct 2026
Parking canopy vs rooftop solar: which sites rank higherParking canopy or rooftop, which sites rank higher in a portfolio screen, and where ground mount fits into the call.
8 Oct 2026
Roof orientation and tilt: what actually moves C&I yieldHow azimuth, tilt angle and east-west layout change installable kWp on flat C&I roofs, and why it matters before you shortlist a portfolio.
8 Oct 2026
What counts as usable roof area in a commercial solar feasibility studyGross roof area isn't usable area. Here's what gets deducted before a C&I roof pencils for solar, and why that gap matters for ranking sites.